Where is the heart of our main site in Zug? It’s in “ZUGgate”. After all, that is where the Multi Energy Hub is located. This is a joint venture of Tech Cluster Zug AG and the local energy supplier WWZ AG. The independent and intelligently controlled energy system supplies our site and the surrounding neighbourhood with renewable energy from photovoltaics, groundwater and lake water as well as process heat from our operations and neighbouring companies. “The integration of both companies and households in a CO₂-neutral energy network is unique in Switzerland”, says Carina Heuberger, our Director of Production Planning. In her previous role as Director of Lean and Operations Development, she saw how the heating and cooling plant was installed in our high-bay warehouse in 2021. “And that was during ongoing production, which was a challenge”, as Peter Grossenbacher, Director of Infrastructure at V-ZUG, also recalls.
A pioneering project and a venture
There was also no lack of challenges in 2023. On the one hand, the negotiations for energy contracts were rather protracted. “With such a complex undertaking with so many players, this is normal and we are satisfied with the outcome”, notes Grossenbacher. On the other hand, the construction of the logistics tunnel was delayed, which meant that the “Mistral” and “Zephyr Hangar” buildings could not yet be connected to the Multi Energy Hub. This led to a continued need for natural gas in the reporting year, as well as a somewhat more modest emissions reduction than had been hoped. The Multi Energy Hub is a pioneering project – and a venture. Our initial investments alone amount to almost CHF 5 million. However, Grossenbacher and Heuberger are in agreement: when all buildings, including the new office building “Zephyr West”, are supplied with energy by the Multi Energy Hub in 2027, this will lead to a massive reduction in CO₂. “That’s when we will finally see the full power of the Multi Energy Hub!”, Heuberger says. Moreover: “The Multi Energy Hub is a powerful statement for our production site in Zug”, says Grossenbacher with conviction.